Power Complex TeRus on the construction site of Experimental Design Bureau “MIKRON”, LLC

A prototype of the future Complex on EDB “MIKRON” site is aimed at testing and tuning of major technical solutions and technologies for production of heat and electricity from wind power. 

The Complex is meant to supply self-consumption demands of EDB “MIKRON” in heat and electricity working both autonomously and in cogeneration.  

  • Wind turbine
    Ready in 2022
    • Maximum power
      200 kW
    • Rotor diameter
      35 m
    • Tower height
      52,5 m
    • Total weight
      27 tn
    • Material
      aluminum
    • Wind speed range
      2-25 m/s
    1
  • Experimental Lab
    Ready in 2022
    • Floor space – 280 m2
    • Workplaces – 15
    • Facilities – equipment for testing, refinement and assembly of units and blocks.
  • Heat storage
    Ready in 2022
    • Self-supporting fiber-glass construction
    • Advanced heat insulating materials
    • Volume - 288 m3
    • Energy capacity – 12096 Gca
  • Backup and maintenance unit
    Ready in 2022
    • Pumping equipment
    • Standby electric power supplier
    • Hydraulic distribution equipment and automation
    • Automated workstation for maintenance engineer
  • Pipeline
    Ready in 2022
    • Pipes are made of metal-containing polymers
    • High efficiency insulation
    • Outside mounting on crew piles
Experimental Lab
Ready in 2022
  • Floor space – 280 m2
  • Workplaces – 15
  • Facilities – equipment for testing, refinement and assembly of units and blocks.
Назад
Back
  • Test-bed
    Ready in 2021
    • Power of the generator under testing - 200 kW
    • Electric drive – induction motor of 315 kW
    • System of automated control and screening
    • Unit heater - 300 kW
  • Production unit
    Ready in 2022
    • Floor space - 200 m2
    • Workplaces – 9
    • Assembly and refinement of experimental units and blocks, testing of the primary generator
  • Offices
    Ready
    • Floor space - 40 m2
    • Container-type mobile unit
    • Workplaces - 6
    • Automated workstation for technician
Test-bed
Ready in 2021
  • Power of the generator under testing - 200 kW
  • Electric drive – induction motor of 315 kW
  • System of automated control and screening
  • Unit heater - 300 kW
Назад
Back
  • Gear box
    • A standard gear box ГК-1050 combined with an electric motor simulates a turbine shaft with 35 rpm
  • Control panel